Lots of random things were accomplished today but not a ton of visual progress.
About 2/3 of the rear 3:12 pitch roof joists have been put into place. Blocking still needs to be installed in between each joist. Tomorrow that section should be completed and we will either install the 3:12 section on the front, or begin the 8:12 pitch areas.
It's a pretty tricky roof for sure. Glad we have an experienced contractor on the job.
No comments:
Post a Comment