The days sort of blur together when there's not anything absolutely monumental happening.
Anyways, today the chimney was finished up and they also drilled the holes in the concrete foundation to run my 4" sewer line and 1.5" sump pump discharge. That means I can go ahead and finish my sewer line install and get the remaining dirt piles out of the backyard.
They also removed the old driveway apron/curb area and smoothed out the area and filled with new concrete.
About half of the 2nd floor ceiling joists (2x8s) were installed today. I assume the other half will be installed tomorrow?
Also they began work on the roof overhangs.
Finished chimeny. Yes, one of the flues is supposed to be higher than the other.
New ceiling joists
new ceiling joists