Today the roof underlayment was installed. We should be leak free (from the roof at least - window openimgs are still wide open) from here on out.
Also, work began on the sheathing for the 2nd story as well as some other miscellaneous framing tasks.
Tomorrow 2nd story sheathing will continue. Also, the water line will be backfilled.
Progress all around!
The original porch roofing was 3/4" beadboard...most of it still in good shape. One area needed to be cut out and replaced.
Master closet fixed window on the left side, master bathroom window on the right.
Rear master bedroom (right) and bathroom (left) window openings.
Just a photo of where we need to install our attic ladder and then a 6" platform for the 2nd floor heat pump unit.
No comments:
Post a Comment