Semi-closeup showing the wire mesh, insulation board, vapor barrier, and gravel:
They did a good job cutting the foam board to fit around the pipe openings:
Stairwell formwork/rebar detail
Lots of fairly precise rebar work make up the structure of the footers. This is good because the footers support the weight of the concrete walls, floors, and everything above there. Looks like maybe 1 more day of prep work?
Footing inspection is scheduled for Tuesday. I assume the footing pour would happen the next day.
Also, the sewage and sump basins got delivered today. This is one of the largest standard style sewage basins you can purchase. It has a 72 gallon capacity, which is great for if the power goes out and the pump cannot run. At least the thing has a large buffer before it starts to overflow. I didn't really realize how large it would be when I looked at it online.
Relatively uneventful day progress wise today. Interior demo is nearly complete, excavation has just about 2 hours of work left. They have started building the formwork for the footers...hoping to have footers poured on Wednesday, inspection and weather permitting.
Two large deliveries today: Type II EPS foam insulation board (foundation walls, basement slab perimeter) (pictured) and the Henry Blueskin foundation waterproofing membrane.