Siding and other progress

It's been a while since I've posted an update.  Lots has been happening.

We have drywall hung (physically on the walls) in the basement, 1st floor, and part of the 2nd floor (the area where we're not "living").  Drywall is actually FINISHED (taped, mudded, sanded) in the basement and we're in the process now of priming and painting.  We hope to finish that by Sunday or Monday.






Once painting downstairs is complete, we can install the laminate flooring that we purchased from Costco.  Once that is finished, we'll make that bedroom our bedroom and seal off the inside access to it so that workers do not go in and out.

First floor drywall finishing begins tomorrow (Friday) and continues throughout the weekend.  Once done there, the finisher moves upstairs.  We can then start priming and painting the first floor as well, although we'll hold off on the 1st floor flooring until no more workers will be going in and out.

Meanwhile, the exterior trim is finished and the siding install has begun as well.


Today we got a look at the first of the 2nd floor "shingles".  Sorry, not the best picture but if you look closely you can see the look of the shingles on the 2nd floor..

This is not the final color of the siding, although I do very much like this color.  This is just what it looks like in its primed/unfinished state.  It still needs to be painted.  i am hoping for a color similar to this.  Kim wants a dark blue. We'll see how that all pans out!

Tuesday, November 22, 2016

Making progress!

Lots of progress today.

The forms for the basement walls are nearly complete.  Inspection is scheduled for Tuesday of next week, with the concrete pour to occur the following day.

Today also began the removal of our original wood lap siding.  We expected to find some kind of sheathing beneath it, but instead just found tar paper.  We figure they decided the stiffness of the solid wood lap siding was sufficient for bracing purposes way back when the house was built.

Most of the areas where the lap siding was removing have had OSB reinstalled in its place.  This will be the permanent new sheathing. After the siding is removed on the 2nd floor/attic, we will cover it up with plastic to protect against the elements.  No sense putting OSB up there only to tear it down in a week or so.

They will continue removal of the siding tomorrow.  Monday will begin the demolition of the 2nd floor/attic.  They will probably need to take a break on Wednesday during the concrete pour though.