Lots of progress with the first floor wiring. At this rate we will be done much quicker than the 2nd floor.
This is a photo of the kitchen space.
Lots of progress with the first floor wiring. At this rate we will be done much quicker than the 2nd floor.
This is a photo of the kitchen space.
Lots of electrical progress happening. Going to start installing recessed light housings tomorrow. Most of the switch wiring and feeds for the overhead circuits is now in place.
Note the red cable Staples. They are a cool way to get a bunch of cables corraled within a 2x4 wall. I will send lots more photos when it is finished.