I am pretty sure all of the 2nd floor circuits are in place in the box now. Just have a few loose ends to tie up and then we can move down to the 1st floor.
Today the plumbers installed the upstairs hall/shared bathroom bathtub. We still need to build the wall on the end.
No comments:
Post a Comment