Monday, March 13, 2017

Electrical work begins

Over the weekend Dad and I ran the 1/0 SER cable to provide power to each of the three subpanels.  It was a bear to run but now each panel has power and all of the circuits for the corresponding floor can just be run over to panel on the same floor.

Next up is to actually terminate the wire inside all of the boxes and install the (3) 100-amp double pole breakers (1 for each subpanel).  Also, the basement subpanel needs to have its separate meter (not a power company thing) installed by me.

Finally, we had some help with Kim's dad starting the wiring for the outlets in one of the bedrooms.

Lots of progress all around.

2nd floor subpanel - located at the end of the hallway.


1st floor subpanel location (located centrally on the 1st floor)

basement subpanel location:


Right now it looks super ugly, but once terminated it will all look much better.


1st floor bedroom wiring...