Corrected 2nd floor windows delivered and installed on Friday. Note the lack of a gap between the two windows. This is how three of the rooms upstairs should have been ordered originally.
Also the two new rear doors were installed.
Massive new porch door assembly arrived as well. It will be installed sometime this week. Unfortunately previous contractor ordered it "stain grade" instead of primed, so we will have to prime and paint it.
Showing posts with label windows. Show all posts
Showing posts with label windows. Show all posts
Sunday, May 14, 2017
Saturday, April 1, 2017
Windows and wiring
Family room windows got installed yesterday. Glad to finally have that space enclosed. We will soon be purchasing the exterior door. One of the kitchen windows is in but the other was only ordered recently so will be in in a week or two.
Also making good progress on the wiring upstairs. Recessed lights and ceiling fan boxes going in. Today Kim and I will be doing wiring for the wall outlets upstairs.
Kitchen window
Master closet pocket door frame#1
Master closet recessed lights:
Upstairs bedroom closet
Friday, March 24, 2017
Windows!
Today we finally got some of the windows installed. The install is by no means complete but at least they are in place and tacked in. They still need to be caulked and flashing needs to be installed over top of the side and top flanges. The window opening itself gets flashing installed prior to setting the window in place but the bottom flange of the window assembly itself does not get flashed as that allows any rain that gets into the window to drain away from the wood on the side of the house.
Also today the flat sections of the roof got shingles installed. Not much to see with that as it's not really visible from the street or the back yard. The roofers got rained on and decided to finish early today as the steep sections were a bit too slippery. They will return tomorrow to finish everything up.
Exterior view of the hall bath and laundry windows:
Master bath (left side) and master bedroom (right side)
Master closet fixed pane window:
Panorama of the upstairs. TONS of natural light throughout although the absence of drywall does create a bit of an artificial effect. Still, glad we chose windows on the larger end of the spectrum.
Also the second kitchen window opening was finally cut out today:
Also today the flat sections of the roof got shingles installed. Not much to see with that as it's not really visible from the street or the back yard. The roofers got rained on and decided to finish early today as the steep sections were a bit too slippery. They will return tomorrow to finish everything up.
Exterior view of the hall bath and laundry windows:
Master bath (left side) and master bedroom (right side)
Master closet fixed pane window:
Panorama of the upstairs. TONS of natural light throughout although the absence of drywall does create a bit of an artificial effect. Still, glad we chose windows on the larger end of the spectrum.
Also the second kitchen window opening was finally cut out today: