Dig a bunch of digging this weekend getting the discharge line for the sump pump in place. Y'd it with another 3" line to be used for the gutter.
Both go to a single 4" pipe that connects to the drywall.
Still need to get more gravel to fill up the rest of the drywall pit.
Wish I could have been there to assist 'in the trenches'.
ReplyDelete