Also, the County showed up today to begin the water line work. They broke up the pavement, dug out a spot for the new water meter crock, and installed it. Tomorrow or perhaps Friday they will return to actually run the upgraded copper pipe from the main (in the center of the street) over into the meter crock.
Showing posts with label joist. Show all posts
Showing posts with label joist. Show all posts
Wednesday, January 11, 2017
Continued Framing + Water Line Upgrade
Today we installed the triple LVL beam that supports the 2nd floor floor joists. Then, the joists themselves were cut and installed, and finally a few sections of the tongue and groove plywood subfloor were glued and nailed into place.
Also, the County showed up today to begin the water line work. They broke up the pavement, dug out a spot for the new water meter crock, and installed it. Tomorrow or perhaps Friday they will return to actually run the upgraded copper pipe from the main (in the center of the street) over into the meter crock.
Also, the County showed up today to begin the water line work. They broke up the pavement, dug out a spot for the new water meter crock, and installed it. Tomorrow or perhaps Friday they will return to actually run the upgraded copper pipe from the main (in the center of the street) over into the meter crock.