Saturday, March 25, 2017

Shingles


Shingles were installed today. Looks great!


Built out the closet in the 2nd floor front bedroom.  Very tricky with the wide opening and the sloped ceiling!

Also finished the wiring for the 2nd floor dryer outlet.  On the left side is the water supply and drain box for the washer that will be recessed into the wall.


No comments:

Post a Comment