Thursday, December 1, 2016

Wall Pour!

Today feels like a momentous day, but really the forms (i.e. general shape of the walls) have been in place for a while now.

In any case, the concrete pour went according to plan as far as I can tell.  No word yet on when the floor will have the gravel installed, which is a requirement before I can start laying down drain plumbing.

I assume they will return on Saturday to remove the forms.

I haven't ventured down into the "pit' yet to see if all of my electrical boxes stayed in position.  Not much I can do about it now in any case.





2 comments:

  1. Looks like two of the images here may be movies...but they don't play on my iPad as opposed to other movies you've posted in the past.

    ReplyDelete
    Replies
    1. I think the way I uploaded them this particular post was outside of Youtube. So, it posted them directly as .mp4 files, which I guess your iPad can't natively open?

      I just uploaded them to the youtube channel (https://www.youtube.com/channel/UC694In7I5BNIbfI9dWjiuWQ) as well.

      Delete