I have been so swamped with wiring that I haven't had time to take photos or post updates. Ended a bit early tonight so here ya go.
Both wiring and plumbing are nearly complete. Lots of other tasks left to be done though.
Did a new walkthrough video: https://youtu.be/t8pkIVmOVdI
Basement bedroom wall that we framed out today.
Final window in the house has been installed!!
PEX plumbing coming along nicely. Apartment manifold/meters on right, main house manifold on left.
Double 30" pocket door rough-in
1st floor completed sub-panel
No comments:
Post a Comment