Sunday, April 23, 2017

Another post

I have been so swamped with wiring that I haven't had time to take photos or post updates.  Ended a bit early tonight so here ya go.

Both wiring and plumbing are nearly complete.  Lots of other tasks left to be done though.

Did a new walkthrough video: https://youtu.be/t8pkIVmOVdI


Basement bedroom wall that we framed out today.

Final window in the house has been installed!!

PEX plumbing coming along nicely.  Apartment manifold/meters on right, main house manifold on left.

Double 30" pocket door rough-in

1st floor completed sub-panel

No comments:

Post a Comment