Also check out the video walkthrough...
Https://YouTube.be/7c5AjbgyNJE
First day of excavation...lots of demoing going on inside as well. We decided to take down all of the plaster walls, including the ones that are not being otherwise modified.
Rear framing demolition has been completed. Excavator is in place to start digging tomorrow, weather permitting. Interior demolition of the ceilings has begun as well.
We discovered an old steel lined well in the backyard today. It goes down about 12.5 feet. We will probably be demolishing down about 9 feet of it, and then filling in the rest with concrete.