All but one of the low voltage wires has been run. The remaining one is a very short one and will be done tomorrow after I get more cable. Also had a chance to mount the wiring cabinet ("structured media enclosure"). Looking forward to wiring this bad boy up!
I also got the double pocket door framing completed in the 1st floor study.
Finally, don't have a photo of it but the shingles on the revised porch dormer were installed this morning...so we are ready for the rain that is expected over the next several days.

