Lots of progress today.
First and most importantly, all 4 of our inspections passed (plumbing, electrical, HVAC, and framing). This means we can proceed with insulation and drywall.
Insulation scheduled to begin tomorrow, drywall on Thursday (though that might have to be pushed back, we will see).
Also, the storage unit was removed today. Not quite sure why but I was a bit nostalgic seeing it get loaded up onto the trailer.
Finally, we got our first toilet and sink installed today. We installed the basement bathroom toilet, finalizing things with the sewage ejector, and go the laundry utility sink installed.
So, now we have an actual bathroom AND a place to wash hands/paintbrushes. It may sound simple but it is a big psychological/symbolic step.